Retroactive Review Plan

Components built before the workflow upgrade (2026-03-27) haven't been through the full quality gate lifecycle. This plan reviews them using a lighter process focused on catching real issues, not re-polishing what already works.

Approach

Use the condensed review process from component-lifecycle.md:

  1. /normalize {tier} — Scan the tier for cross-component consistency
  2. /audit {component} — Score each component (only those scoring < 16/20 need fixes)
  3. Fix P0/P1 issues only
  4. /preflight → commit

Priority Order

Review bottom-up: atoms first (they're the foundation everything builds on), then molecules, then organisms. Within each tier, prioritise by usage — components used by many others matter more than standalone ones.


Phase 1: Atoms (foundation layer — highest priority)

Step 1.1 — Normalize all atoms

Run /normalize atoms once to get a cross-component consistency report. Expected findings: token access patterns (D031), transition timing, focus styles. Fix all issues in a single batch commit.

Step 1.2 — Audit each atom

Run /audit on each atom. Components already audited in previous sessions have scores on record. Focus on those that scored < 16/20 or were never audited.

Atom Last Audit Score Priority
Button 20/20 (2026-03-27) High Done
Typography Medium (display-only)
Input 20/20 (2026-03-27) High Done
Card 20/20 (2026-03-27, after P1 fixes) High Done
Badge Medium (fixed in D031)
Chip Low (minimal wrapper)
Switch Low (minimal wrapper)
Radio Low (minimal wrapper)
IconButton Low (minimal wrapper)
Divider Low (minimal wrapper)
Link Low (minimal wrapper)

Estimated effort: 1 session for normalize + audit of high/medium priority atoms.


Phase 2: Molecules (composition layer)

Step 2.1 — Normalize all molecules

Run /normalize molecules for cross-component consistency.

Step 2.2 — Audit + critique priority molecules

Run /audit and /critique on molecules with real layout complexity.

Molecule Last Scores Priority
ProviderCard Critique 33/40 (v2 iteration) Medium (user-approved)
VenueCard Critique 33/40 Medium (user-approved)
SearchBar Critique 35/40 Low (high scores already)
ServiceOption Audit 13/20 (2026-03-30, P1 fixed) Medium Done
AddOnOption Audit 14/20 (2026-03-30, P1 fixed) Medium Done
StepIndicator Low (display-only)
LineItem Audit 19/20 Low (excellent score)
ProviderCardCompact Audit 15/20 (2026-03-30, P2 fixed) Medium Done

Estimated effort: 1 session for normalize + audit of medium priority molecules.


Phase 3: Organisms (page-level compositions)

Step 3.1 — Normalize all organisms

Run /normalize organisms for cross-component consistency.

Step 3.2 — Full review of critical organisms

Organisms are the most complex and user-facing. Run /audit + /critique + /harden on each.

Organism Last Scores Priority
Navigation High (site-wide, visible on every page)
Footer Critique 38/40 Low (excellent score)
ServiceSelector High (arrangement flow core)
PackageDetail Audit 19/20 Low (excellent score)
FuneralFinder V1 Audit 14/20, Critique 29/40 Medium (pending production decision)
FuneralFinder V2 Audit 18/20, Critique 33/40 Medium (pending production decision)
FuneralFinder V3 Audit 18/20, Critique 33/40 Medium (pending production decision)

Note on FuneralFinder: All three versions exist. A production decision (v1 vs v2 vs v3) is still pending. Only review the chosen version in depth. The others can be archived or retained as alternatives.

Estimated effort: 1 session for normalize + audit/critique of Navigation + ServiceSelector.


Phase 4: Cross-cutting concerns

After individual components are clean:

  1. Form error colour normalisation (D034): Done (2026-03-28). Copper error styling in MuiOutlinedInput, MuiFormHelperText, MuiFormLabel, ToggleButtonGroup.
  2. Run /adapt on all organisms + ProviderCard/VenueCard (responsive check) Done (2026-03-31d). Navigation + Footer touch targets fixed (P0/P1). ProviderCard/VenueCard: no action needed (card is the touch target).
  3. Run /typeset across a representative sample of each tier
  4. Run /preflight to verify the full codebase
  5. Commit all fixes

Estimated effort: 0.5 session (remaining: typeset + preflight only).


Total estimated effort: ~3.5 sessions

Phase Focus Effort
1 Atoms normalize + audit 1 session
2 Molecules normalize + audit 1 session
3 Organisms normalize + audit/critique/harden 1 session
4 Cross-cutting (adapt, typeset, preflight) 0.5 session

This can be interleaved with new component work — e.g., review atoms in the morning, build a new molecule in the afternoon. The review findings often improve the patterns used in new components.


Decisions (confirmed 2026-03-27)

  1. FuneralFinder version — V3 is production. V1/V2 archived (viewable in Storybook under Archive/). Only V3 gets the full review.
  2. Depth — P0/P1 only. Don't touch P2/P3 — not worth the risk on approved components.
  3. Approach — Interleaved. Start each session with a review pass (~30-60 min), then shift to new component work. This is automated — the agent runs it proactively at session start without being asked.