Retroactive Review Plan
Components built before the workflow upgrade (2026-03-27) haven't been through the full quality gate lifecycle. This plan reviews them using a lighter process focused on catching real issues, not re-polishing what already works.
Approach
Use the condensed review process from component-lifecycle.md:
/normalize {tier}— Scan the tier for cross-component consistency/audit {component}— Score each component (only those scoring < 16/20 need fixes)- Fix P0/P1 issues only
/preflight→ commit
Priority Order
Review bottom-up: atoms first (they're the foundation everything builds on), then molecules, then organisms. Within each tier, prioritise by usage — components used by many others matter more than standalone ones.
Phase 1: Atoms (foundation layer — highest priority)
Step 1.1 — Normalize all atoms
Run /normalize atoms once to get a cross-component consistency report.
Expected findings: token access patterns (D031), transition timing, focus
styles. Fix all issues in a single batch commit.
Step 1.2 — Audit each atom
Run /audit on each atom. Components already audited in previous sessions have
scores on record. Focus on those that scored < 16/20 or were never audited.
| Atom | Last Audit Score | Priority |
|---|---|---|
| Button | 20/20 (2026-03-27) | |
| Typography | — | Medium (display-only) |
| Input | 20/20 (2026-03-27) | |
| Card | 20/20 (2026-03-27, after P1 fixes) | |
| Badge | — | Medium (fixed in D031) |
| Chip | — | Low (minimal wrapper) |
| Switch | — | Low (minimal wrapper) |
| Radio | — | Low (minimal wrapper) |
| IconButton | — | Low (minimal wrapper) |
| Divider | — | Low (minimal wrapper) |
| Link | — | Low (minimal wrapper) |
Estimated effort: 1 session for normalize + audit of high/medium priority atoms.
Phase 2: Molecules (composition layer)
Step 2.1 — Normalize all molecules
Run /normalize molecules for cross-component consistency.
Step 2.2 — Audit + critique priority molecules
Run /audit and /critique on molecules with real layout complexity.
| Molecule | Last Scores | Priority |
|---|---|---|
| ProviderCard | Critique 33/40 (v2 iteration) | Medium (user-approved) |
| VenueCard | Critique 33/40 | Medium (user-approved) |
| SearchBar | Critique 35/40 | Low (high scores already) |
| ServiceOption | Audit 13/20 (2026-03-30, P1 fixed) | |
| AddOnOption | Audit 14/20 (2026-03-30, P1 fixed) | |
| StepIndicator | — | Low (display-only) |
| LineItem | Audit 19/20 | Low (excellent score) |
| ProviderCardCompact | Audit 15/20 (2026-03-30, P2 fixed) |
Estimated effort: 1 session for normalize + audit of medium priority molecules.
Phase 3: Organisms (page-level compositions)
Step 3.1 — Normalize all organisms
Run /normalize organisms for cross-component consistency.
Step 3.2 — Full review of critical organisms
Organisms are the most complex and user-facing. Run /audit + /critique +
/harden on each.
| Organism | Last Scores | Priority |
|---|---|---|
| Navigation | — | High (site-wide, visible on every page) |
| Footer | Critique 38/40 | Low (excellent score) |
| ServiceSelector | — | High (arrangement flow core) |
| PackageDetail | Audit 19/20 | Low (excellent score) |
| FuneralFinder V1 | Audit 14/20, Critique 29/40 | Medium (pending production decision) |
| FuneralFinder V2 | Audit 18/20, Critique 33/40 | Medium (pending production decision) |
| FuneralFinder V3 | Audit 18/20, Critique 33/40 | Medium (pending production decision) |
Note on FuneralFinder: All three versions exist. A production decision (v1 vs v2 vs v3) is still pending. Only review the chosen version in depth. The others can be archived or retained as alternatives.
Estimated effort: 1 session for normalize + audit/critique of Navigation + ServiceSelector.
Phase 4: Cross-cutting concerns
After individual components are clean:
Form error colour normalisation (D034):Done (2026-03-28). Copper error styling in MuiOutlinedInput, MuiFormHelperText, MuiFormLabel, ToggleButtonGroup.RunDone (2026-03-31d). Navigation + Footer touch targets fixed (P0/P1). ProviderCard/VenueCard: no action needed (card is the touch target)./adapton all organisms + ProviderCard/VenueCard (responsive check)- Run
/typesetacross a representative sample of each tier - Run
/preflightto verify the full codebase - Commit all fixes
Estimated effort: 0.5 session (remaining: typeset + preflight only).
Total estimated effort: ~3.5 sessions
| Phase | Focus | Effort |
|---|---|---|
| 1 | Atoms normalize + audit | 1 session |
| 2 | Molecules normalize + audit | 1 session |
| 3 | Organisms normalize + audit/critique/harden | 1 session |
| 4 | Cross-cutting (adapt, typeset, preflight) | 0.5 session |
This can be interleaved with new component work — e.g., review atoms in the morning, build a new molecule in the afternoon. The review findings often improve the patterns used in new components.
Decisions (confirmed 2026-03-27)
- FuneralFinder version — V3 is production. V1/V2 archived (viewable in Storybook under Archive/). Only V3 gets the full review.
- Depth — P0/P1 only. Don't touch P2/P3 — not worth the risk on approved components.
- Approach — Interleaved. Start each session with a review pass (~30-60 min), then shift to new component work. This is automated — the agent runs it proactively at session start without being asked.